Loading...

Earth Work

Konkan Railway Earthwork at NTPC Kudgi

Konkan Railway Corporation Limited, Karnataka Earthwork in Cutting & Embankment (Filling), Bridge approaches, side drains, etc., from Chainage 3/800 - 5/400 (Filling beyond Chainage 5/400 and upto Chainage 7/800 also) Package - I at NTPC In-plant yard for construction of new Railway siding for NTPC Limited between Gadag – Hotgi section of South Western Railway at Kudgi

Read More
Earthwork and Track linking work at Khargone (Package V)

Earthwork in Railway formation including filling and cutting, blanketing an construction of bridges, P-way Track linking including supply of Railway ballast and p-way materials, fitting and fixtures (excluding supply of RAILS) etc in connection with construction Railway Infrastructure to serve Khargone STPP (2x660)MW Package-V

Read More
Earthwork and Extension of Bridges at Pune-Miraj

Earthwork in embankment and cutting including extension of Minor Bridges and RUBs in connection with Pune-Miraj doubling from km 0.00 (Pune) to km 65 (excluding Daunduj)

Read More
Construction of Itarsi-Nagpur third line project

Construction of Minor Bridges (RCC Box), Earthwork in formation side drains and Toe/ retaining wall between Km. 912 to Km 930.4 between Chichonda section (including) and Teegaon Station (Including) for Teegaon-Chichonda 3rd Line of Itarsi-Nagpur Section.

Read More

Tukaithad

Engineering works of construction for Gauge Conversion of Track between joining Point at Ch: 621.400m, Amlakhurd station (excl) & Ch: 634.260m Tukaithad station (incl) i.e.(12.86km) including Electrical General Services of South Central Railway on EPC mode

Gwalior

Gwalior-Sheopuprkalan Earthwork in Embankment and Cutting including blanketing, Construction of Minor Bridges, LHS/Subways, Side Drains, retaining/Toe Walls and Other Ancillary works/services works between Sumaoli (Exclu.)- Sabalgarh (Inclu.) and dismantling of existing NG track between Banmoregoan to Sabalgarh

Khadia

Excavation of Overburden of First Dig (Solid) overburden by Mechanical Means such as Excavators, Dumpers/Tippers, Drills, Dozers, Graders and Water Sprinklers for Composite Work Consisting of Blast Hole Drilling, Excavation, Loading, Transportation of Broken Rocks/ Soil/ Earth, Unloading/Dumping, Spreading, Dozing, Water Sprinkling and Grading etc. as per Instructions of Engineer-in-charge at Specified Places at Khadia OCP of NCL.

Jammu

Land development work at Jammu & Kashmir