Khadia
Excavation of Overburden of First Dig (Solid) overburden by Mechanical Means such as Excavators, Dumpers/Tippers, Drills, Dozers, Graders and Water Sprinklers for Composite Work Consisting of Blast Hole Drilling, Excavation, Loading, Transportation of Broken Rocks/ Soil/ Earth, Unloading/Dumping, Spreading, Dozing, Water Sprinkling and Grading etc. as per Instructions of Engineer-in-charge at Specified Places at Khadia OCP of NCL.