Projects by map

Completed
# Project Name Location Description Position Status
3 Construction of Major Bridges, Underpasses for Wildlife and Road Over Bridges (ROBs) Chhattisgarh Construction of Major Bridges, Underpasses for Wildlife and Road Over Bridges (ROBs) between Urga (0 Km) to Dharamjaigarh (62 Km) Single line in connection with the construction of New BG Electrified Single Railway Line for Chhattisgarh East Rail Corridor Phase-II. IRCON Ongoing

# Project Name Location Description Position Status
2 Bhuj Naliya Gauge Conversion Project. Gujarat Laying and linking of tracks and various P.way works, supply of ballast, Earthworks in bank and cutting for formation including supplying and spreading of blanketing material, minor bridges with PSC Slabs, RCC pipes, RCC box bridges, RCC Boxes in connection with closed LCs (other than LHS), Protection works such as stone pitching, construction of Toe walls, Retaining walls, Side drains, etc Western Railway Ongoing
10 Design, Supply, Installation, Testing and Commissioning of Ballastless Track for GMRCL Gujarat Design, Supply, Installation, Testing and Commissioning of Ballastless Track from Sarthana to Dream City in Elevated and Underground Sections Including Connecting Lines to Depot along with Ballasted / Ballastless / Embedded Standard Gauge Track For Corridor-I. Gujarat Metro Rail Corporation Limited Ongoing

# Project Name Location Description Position Status
19 Construction of Elevated BG Railway line. Haryana Construction of Elevated BG Railway line from Km 80/1 to Km 85/7 along with elimination of 05 nos. Level crossings in Kurukshetra City. HRIDC Ongoing

# Project Name Location Description Position Status
13 Construction of 05 Nos. of Major Bridges & 05 Nos. of ROBs Jharkhand Construction of 05 Nos. of Major Bridges & 05 Nos. of ROBs from 28.682 Km to 44.278 Km between Simariya and Shivpur. IRCON Ongoing
14 Construction of 6 Nos. RUB/LHS in lieu of existing level crossing Jharkhand Construction of 6 Nos. RUB/LHS in lieu of existing level crossing No. 4/C/E at km 277/22-24, 5/C/T at km 278/18-20, 6/C/T at km 281/4-6, 7/C/E at km 283/16-18, 10A/C/T at km 306/11-13 & 11/C/T at km 309/19-21 in between PKA-MPO section of Dhanbad division East Central Railway Ongoing
18 Construction of Superstructure of 09 nos Major Bridges. Jharkhand Construction of Superstructure of 09 nos Major Bridges in connection with 3rd line of Tori Shivpur New B.G. Rail line Project. East Central Railway Ongoing

# Project Name Location Description Position Status
1 Construction of bridge work (Major/Minor - foundation, sub structure and super structure) Madhya Pradesh Earthwork & Blanketing in embankment /cutting in formation of new BG line including yards, bridge approaches etc., Construction of bridge work (Major/Minor - foundation, sub structure and super structure) as per Railway's approved Design and Drawing, carting of steel girder component, construction of Retaining/Boundary/Toe wall, supply & spreading of machine crushed stone ballast, Laying and linking of BG track for Main line, loop lines and Points&Crossing etc in section/ yards, Transportation of P.Way materials, Welding of Rails, and other incidental miscellaneous works etc Western Railway Ongoing
6 Gauge Conversion of Track between joining Point at Amlakhurd station and Tukaithad station on EPC mode. Madhya Pradesh Engineering works of construction for Gauge Conversion of Track between joining Point at Amlakhurd station and Tukaithad station including Electrical General Services on EPC mode. South Central Railway Ongoing
9 Four-Laning of NH-45 of Jabalpur Ring Road, Pkg-3. Madhya Pradesh Construction of Four-Laning of NH-45 to Kushner from km 39.175 to km 75.480 (Jabalpur Ring Road, Pkg-3) under Bharatmala Pariyojana. NHAI Ongoing
11 Ballasted/Ballastless Tracks for complete Indore Metro Rail Project for MPMRCL Madhya Pradesh Design, Supply, Installation, Testing and Commissioning of Ballastless Track of Standard Gauge, Yellow Line from Gandhinagar- Bawarsala-Bengali Square-Indore Railway Station and Underground from Indore Railway Station to Airport Station of Yellow Line Corridor. Madhya Pradesh Metro Rail Co Limited Ongoing
15 Conversion of track from MG to BG Madhya Pradesh Conversion of track from MG to BG between Khandwa and Amlakhurd stations- Proposed transportation of Rails & Sleepers, laying and linking of BG track, assembling of Points & Crossings and connected works. South Central Railway Ongoing
20 10 Nos Major Bridges in between Gwalior to Sabalgarh section Madhya Pradesh Construction of 10 Nos Major Bridges in between Gwalior to Sabalgarh section in connection with the work of Gauge conversion from Gwalior to Sheopurkalan. North Central Railway Ongoing
21 Earthwork in Embankment and Cutting including blanketing, Minor Bridges at Gwalior Madhya Pradesh Earthwork in Embankment and Cutting including blanketing, Construction of Minor Bridges, LHS/Subways, Side Drains, retaining/Toe Walls and Other Ancillary works/services works between Sumaoli (Exclu.)- Sabalgarh (Inclu.) and dismantling of existing NG track between Banmoregoan to Sabalgarh, Gwalior- Sheopuprkalan North Central Railway Ongoing

# Project Name Location Description Position Status
5 Construction of new BG line in Solapur-Osmanabad section. Maharashtra Construction of new BG line from chainage 52500 to 83200 in Solapur-Osmanabad section of Solapur Division. Central Railway Ongoing
8 Track (P.Way) works of Proposed New 3rd line and Yards between Chalisgaon to Manmad. Maharashtra Track (P.Way) works of Proposed New 3rd line and Yards between Chalisgaon (Including) to Manmad (Including) section 67.28Kms in connection with MMR- JL 3rd line. Central Railway Ongoing
22 Minor Bridges,Major Bridges, ROBs & RUBs at Yavatmal Maharashtra Construction of Roadbed, Minor Bridges,Major Bridges, ROBs & RUBs including road approaches , Station Buildings, Staff Quarters, Other service buildings, HL Platforms, COPs, FOBs, General Electrification & other Works related to Construction of Yavatmal – Nanded New BG Line from km 78.00 (Excluding Yavatmal Station) to km 110 (Including Tapona Station) of Central Railway. Rail Vikas Nigam Limited Ongoing
23 ROB and RUB works at Savda Railway Station Maharashtra Construction of ROB and RUB, Limited Height Subway in lieu of existing railway crossing No. 162 at Kms 459/9-11 near Savda Railway Station Central Railway Ongoing
24 Bridges and Earthwork between Chalisgaon-Jalgaon section Maharashtra Construction of 165 nos. Minor Bridges in Earthwork and Embankment and Cutting between Chalisgaon Jalgaon section. Central Railway Ongoing
25 Railway Siding Works Consists of P-Way Linking, (ROB), (OHE) and (S&T) work at Deepnagar, Bhusawal Maharashtra Construction of Railway Siding Works Consists of P-Way Linking, Road Over Bridge (ROB), Over Head Electrification (OHE) and Signaling & Telecommunication (S&T) for MSPGCL. BHEL Ongoing

# Project Name Location Description Position Status
17 Construction of 2 lane ROB Rajasthan Construction of 2 lane ROB in Lieu of LC No.- 179X at Railway Km. 1094/36 -1095/02 at Gangapur City. EPIL Ongoing

# Project Name Location Description Position Status
7 Maintenance of double line BG track including DFCCIL Yards. Uttar Pradesh Maintenance of double line BG track including DFCCIL Yards, Formation, Major & Minor Structure, Civil Works like Buildings (i.e Stations, IMDs / IMSDs / ALH / RH / GSMR / Gate lodge & other allied buildings) of New Bhaupur to New Khurja Section (i/c its connecting lines with IR) of Eastern Dedicated Freight Corridor. DFCCIL Ongoing
12 Excavation of overburden of first dig (solid) Uttar Pradesh Excavation of overburden of first dig (solid) overburden for composite work consisting of blast hole drilling, excavation, loading, transportation of broken rocks/ soil/ earth, unloading/dumping, spreading, dozing, water sprinkling and grading at Khadia. Northern Coalfields Limited Ongoing
16 Construction of approaches & viaduct of Br No 111, Roadbed, Major & Minor bridges Uttar Pradesh Construction of approaches & viaduct of Br No 111, Roadbed, Major & Minor bridges between Jhusi (excluding) to Prayagraj Rambag (excluding). RVNL Ongoing

# Project Name Location Description Position Status
11 Land development work Jammu Land development work at Jammu & Kashmir Bharat Petroleum Corporation Limited Completed
# Project Name Location Description Position Status
13 Permanent way and associated civil works Jharkhand Permanent way and associated civil works for Railway siding at BPCL Radhagaon POL depot, Bokaro Bharat Petroleum Corporation Limited Completed
48 Steel Composte Girder ROB between Lohardaga and Tori Jharkhand Construction of Steel composite Girder Road Over Bridge No. 75C of Span 1 X 24 M at Chandwa Town (Ch 40.305 km) over Chandwa Mckluesganj Road (SH-142) between Lohardaga (0.00 km) and Tori and other allied work of S.E.Railway South Eastern Railway Completed
# Project Name Location Description Position Status
80 Earthwork in Cutting & Embankment (Filling) at NTPC In-plant yard - Kudgi (Package I) Karnataka Earthwork in Cutting & Embankment (Filling), Bridge approaches, side drains, etc., from Chainage 3/800 – 5/400 (Filling beyond Chainage 5/400 and upto Chainage 7/800 also) Package – I at NTPC In-plant yard for construction of new Railway siding for NTPC Limited between Gadag – Hotgi section of South Western Railway at Kudgi. Konkan Railway Corporation Limited Completed
48 Track work at NTPC Kudgi Karnataka LINKING OF TRACK AND COMMISSIONING OF RAILWAY SIDING INCLUDING SUPPLYING OF PSC SLEEPERS, TRACK FITTINGS, TURNOUTS, BALLAST BETWEEN CH 2/850 TO CH 10/200 FOR KUDGI STPP,NTPC LTD. AT KUDGI, DIST BIJAPUR, KARNATAKA Konkan Railway Corporation Ltd Completed
# Project Name Location Description Position Status
28 Composite Girder and Major Bridge at Gadarwara Madhya Pradesh Construction of composite Girder Major Bridge (Well foundation) for Shakkar river at Ch. 6770 and construction of other 10 pre- tensioned/ post tensioned single/ double span bridges (6.1 M, 9.15 M, 12.2 M) between ch. 0/178 to ch. 5/980 for Gadarwara Railway siding. RITES Limited Completed
29 Earthwork and Track Linking at Khargone (Package II) Madhya Pradesh Earthwork in Railway formation including filling, cutting, blanketing and construction of bridges, P way track linking works including supply of Railway track ballast and P way materials, fittings and fixtures (including supply of Rails) etc. in connection with construction of Railway infrastructure to serve Khargone STPP (2X660) MW (Package II) RITES Limited Completed
30 Earthwork and Track Linking at Khargone (Package V) Madhya Pradesh Earthwork in Railway formation including filling, cutting, blanketing and construction of bridges, P way track linking works in connection with construction of Railway infrastructure to serve Khargone STPP (2X660) MW (Package V) RITES Limited Completed
39 Earthwork, Track linking & ROB at NTPC Khargone (In-Plant Yard) Madhya Pradesh Construction of Earthwork, ROB along with approaches, supply of ballast, p-way materials, p-way linking and allied works for private railway siding works at in plant yard of NTPC Khargone STPP RITES Limited Completed
81 Railway siding work at Sanjay Gandhi Thermal Power Station, Birsinghpur - Umaria Madhya Pradesh Laying & Linking of P. way including supply of P. way Materials, turnouts, supply and spreading of stone ballast, supply of PSC sleeper etc. complete in connection with proposed Railway siding at SGTPS at Birsinghpur Dist. Umaria for M/s. MPPGCL RITES, Nagpur / Madhya Pradesh Power Generation Co. Ltd. (MPPGCL) Completed
# Project Name Location Description Position Status
10 Weld Renewal by FBW at Ahmedabad Gujarat Conversion of SWR/Free rails into LWR by using flash butt welds with mobile flash butt Plant Western Railway Completed
43 Doubling of Track between Palanpur and Bhildi in Ahmedabad Division Gujarat Doubling of track between Palanpur and Bhildi (43.68 Kms.) – Construction of Roadbed, bridges, supply of ballast, Installation of track (excluding supply of rails & PSC line sleepers), Electrical (General Electrification), Signaling and Telecommunication works. Package 5 in Ahmedabad Division of Western Railway RVNL Completed
44 Roadbed, Bridges, Supply of Ballast, Installation of Track Package-2 in Bhavnagar Division Gujarat Construction of Roadbed, bridges, supply of ballast, Installation of track (excluding supply of rails & PSC sleepers), Electrical (Railway Electrification and General Electrification), outdoor signalling and telecommunication works for Gauge conversion of track between Lunidhar (excluding) and Jetalsar (including) from Km. 49.50 to Km. 104.50. Package-2 in Bhavnagar Division of Western Railway RVNL Completed
54 Gauge Conversion BOT Project between Mehasana -Viramgam Section. Gujarat Gauge Conversion between Ch 000m to 24000m of Mehasana -Viramgam Section including earth works, bridge works & gate approaches excluding track fittings of Western Railway on BOT basis track linking contract. Western Railway / Viramgam Mehesana BOT Project. Completed
64 Surendranagar Pipavav BG Rail Link Project. Gujarat Linking of BG Main line, Points and Crossings at various yards, spreading of ballast, P.way materials and other incidental works between stations Surendranagar (Incl) KM 0.00 and Chuda (Excl) KM 38.80 in connection with Surendranagar Pipavav BG Rail Link Project. Western Railway, Mumbai Completed
# Project Name Location Description Position Status
9 Stone Crushed Ballast Supply at Bhusawal Division Maharashtra Supply and Stacking of 65 mm Gauge Machine Crushed Stone Ballast and loading into Hoppers/Boby and wagons by mechanical means. Central Railway Completed
12 Proposed elimination of Level Crossing Maharashtra Proposed elimination of Level crossing by providing subway by box pushing method in lieu of LC No. LC 158 at Kms 452/22-24, LC No 165 at Km 464/10 -12, LC No. 166 at Km 466/02-04, LC No. 170 at Km 472/22-24, LC No. 174A at Km 496/10-12, LC No. 174 at Km 492/22-24, LC No. 172 at Km481/22-24 and LC No. 164 at Km 462/00-02. Central Railway Completed
17 Stone Crushed Ballast Supply at Ahmednagar – Beed – Parli (IV) Maharashtra Supply of machine crushed stone ballast of size 65mm as per RDSO specification for track ballast IRS GE-1 June 2004 & stacking same along cess/ within available space on Railway Land or on the embankment as directed by Engineer-in-charge between km 210.000 to Parli (V) in Beed-Parli section in connection with Ahmednagar-Beed-Parli Vaijnath New Broad Gauge Line Project Central Railway Completed
18 Stone Crushed Ballast Supply at Ahmednagar – Beed – Parli (III) Maharashtra Supply of Machine Crushed Stone Ballast of size 65 mm as per RDSO specification for Track ballast IRS GE-1 June 2004 & stacking same along cess / within available space on Railway Land or on the embankment as directed by Engineer - in - charge between Km 142.00 to 160.00 in Amalner-Raimoha Section in connection with Ahmednagar - Beed - Parli Vaijnath New Broad Gauge Line Project Central Railway Completed
19 Stone Crushed Ballast Supply at Ahmednagar – Beed – Parli (II) Supply of Machine Crushed Stone Ballast of size 65 mm as per RDSO specification for Track ballast IRS GE-1 June 2004 & stacking same along cess / within available space on Railway Land or on the embankment as directed by Engineer - in - charge between Km 120.00 to 142.00 in Amalner-Raimoha Section in connection with Ahmednagar - Beed - Parli Vaijnath New Broad Gauge Line Project Central Railway Completed
20 Stone Crushed Ballast Supply at Ahmednagar – Beed – Parli (I) Supply of Machine Crushed Stone Ballast of size 65 mm as per RDSO specification for Track ballast IRS GE-1 June 2004 & stacking same along cess / within available space on Railway Land or on the embankment as directed by Engineer – in – charge between Km 50.250 to 100.252 in Kada – Amalner section in connection with Ahmednagar – Beed – Parli Vaijnath New Broad Gauge Line Project Central Railway Completed
23 Track Work at Pune-Miraj Track work in connection with Pune Miraj Doubling Project Central Railway Completed
26 Weld Renewal by FBW at Kurduwadi Through weld renewal by mobile flash butt welding plant between Km.343.40-345.30=1.90 Km, 345.60-349.20=3.60 Km, 349.50-350.80=1.30 Km, 351.10-383.20=32.10 Km, 397.10-400.20=3.10 km, 400.50-420.80=20.30 Km and 383.50-396.70=13.20 Km, total 75.50 Km. Central Railway Completed
27 Earthwork and Extension of Bridges at Pune-Miraj (Section I) Earthwork in embankment and cutting including extension of Minor Bridges and RUBs in connection with Pune-Miraj doubling from km 0.00 (Pune) to km 65 (excluding Daunduj) Central Railway Completed
33 Railway Siding Earthwork at Tilati station in Solapur Division Execution of Railway Siding works consisting of Earthwork in embankment and cutting, Supply and spreading of Ballast, Supply of P-Way materials, Laying and linking of Railway Track, construction of bridges, works for entire siding in both In-plant yard and Station yard for CCCL- Solapur proposed siding take off from New Tilati station in Solapur Division of Central Railway Chettinad Cement Completed
34 Road Over Bridge at Chandrapur Construction of Road Over Bridge (ROB) for BG Railway Siding at CSTPS Chandrapur Rail Infrastructure Facilities at Chandrapur Distt. (MS) for the proposed 2x500 MW expansion Project. Maharashtra State Power Generation Co. Limited Completed
36 Private Railway Siding at NTPC Limited near Hotgi Railway Station Construction of Private Railway Siding with all Contractor’s materials (except Rails for plain track issued free of cost) for coal transportation system for SSTPP of NTPC Limited near Hotgi Railway Station – Civil works from Ch. 2.400 to Ch. 6.000 & P.Way works in entire siding system – Pkg. 2 IRCON INTERNATIONAL LIMITED Completed
37 Balance work of Site Leveling & Infrastructure Works near Hotgi Railway Station Balance work of Site Leveling & Infrastructure Works Package for Solapur Super Thermal Power Project (2x 660 MW) NTPC Completed
42 Private Railway Siding at Inplant Yard NTPC- Mouda (Stage-II) Construction of Earthwork, RCC Bridges (Cast-insitu and Cut & Cover), FOB, Loco Shed, Supply of Ballast, P-way Materials and P-way linking work for private railway siding (Stage-II) works at Inplant yard of NTPC- Mouda RITES Ltd. Completed
47 Itarsi-Nagpur third line project Construction of Minor Bridges (RCC Box), Earthwork in formation side drains and Toe/ retaining wall between Km. 912 to Km 930.4 between Chichonda section (including) and Teegaon Station (Including) for Teegaon-Chichonda 3rd Line of Itarsi-Nagpur Section. Central Railway Completed
49 Khamgaon to Deulgaon Road Project Upgradation of Khamgaon to Deulgaon Sakarsha Section (Length of 35.786 Km) of NH-548C from Existing Ch. 565+653 to Ch. 529+867 (Design Ch. 0+000 to Ch. 35+786) in the State of Maharashtra to 2 Lane with Paved Shoulder (Package-I). (Approximately 35.786 km) NHAI Completed
55 Track and Station Building Works at Ratnagiri Main Line Construction of 8 nos. of Crossing stations and 7 nos. of additional loop lines at Existing stations of Konkan Railway. Konkan Railway Corporation Limited Completed
56 Mangrulpir to Mahan Road Project Rehabilitation and Upgradation of 2 lane road with paved shoulders of Mangrulpir to Mahan (NH 161 A from 97/074 to 64/574 ) [Design km. 75/000 to km. 107/500] (Total Length = 32.5 Km) in the state of Maharashtra on EPC Basis mode. NHAI Completed
65 CTR (P) of track by PQRS method at IGP Bhusawal. CTR (P) of track by PQRS method bet. Kms.287 to 295&297.2 to326 = 36.80 Tkms(without deep screening)25.00 Tkms by PQRS and 11.80 by manual method on Dn Rd of IGP- BSL sec. CTR (S) of CSN-DHI Sec. Betn Kms. 359.5to 369.5 = 10.00 of IGP-BSL Section Central Railway, Mumbai Completed
66 Puntamba – Shirdi New BG Rail line project. Laying & Linking of track between Ch. 000 to Ch. 18000(Entire Length) in connection with Puntamba – Shirdi New BG Rail line project. Central Railway, Mumbai. Completed
67 Talvadiya-Khirkiya Mainline Diversion Project. (Ch. 000 m to Ch. 30000 m) Linking of Double Line Track, including supply of minor track fitting and other misc. works between Ch. 000m to Ch. 30000 m of Talvadiya-Khirkiya Mainline Diversion Project. Central Railway, Mumbai Completed
68 Laying & Linking of Track at Majri Khadan Laying & Linking of track, assembling& insertion of Turnouts, dismantling of track/ turnouts, welding of Rail joints, running out of ballast etc & Supply of P. way Fittings at Majri, Majri Khadan, Wani & Pimpalkhuti in connection with running of passenger Train services. Central Railway, Mumbai. Completed
69 Narkher - Amravati New BG Line Project Laying & Linking of P. way and supply of P. way fittings etc. between ChandurBazar and Badnera stations in Ch. 94000m to 136150m Narkher - Amravati New BG Line. Central Railway, Mumbai Completed
69 Narkher - Amravati New BG Line Project Laying & Linking of P. way and supply of P. way fittings etc. between ChandurBazar and Badnera stations in Ch. 94000m to 136150m Narkher - Amravati New BG Line. Central Railway, Mumbai Completed
71 Conversion MG to BG Project between Purna – Akola Stations Conversion of Purna-Akola section from MG to BG miscellaneous works including dismantling of existing MG track between Purna – Akola Stations Reach – I, II, V, IX, XII, XIII, XIV, XV, XIX, XX South Central Railway, Secunderabad Completed
74 Khaparkheda TPS (Expansion Project) Khaparkheda TPS (Expansion Project) – Renovation of BG Railway Siding, including Minor earthwork, Misc civil works and all incidentals works etc in Exchange Yard and Implant Yard at Khaparkheda TPS Dist. Nagpur. Maharashtra State Power Generation Co. Ltd. (MSPGCL) Mumbai Completed
75 Gauge Conversion Project between Osmanabad and Kurudwadi Section Laying & Linking of B.G. Track in Osmanabad – Kurudwadi section in connection with Miraj - Latur Gauge Conversion Project Central Railway, Mumbai Completed
76 Complete Rail system Renovation at Nasik TPS, Eklahare. Nasik TPS – Work of Complete Rail system Renovation of Nasik Thermal Power Station including earthwork, all civil works and incidental works etc at Nasik TPS. Eklahare, Nasik. Maharashtra State Power Generation Co. Ltd. (MSPGCL) Mumbai Completed
77 BTPS Expansion Project at Deepnagar BTPS Expansion Project 2x500 MW unit – Construction of B.G Railway siding for Bhusawal TPS Expansion Project 2x500 MW Deepnagar, BHUSAWAL. Maharashtra State Power Generation Co. Ltd. (MSPGCL) Mumbai Completed
82 Gauge Conversion Project between Latur and Osmanabad Section Laying & Linking of B.G. Track in Latur - Osmanabad section & making the same as LWR track including insertion of Glued Joints, SEJ, Providing Check/ guard Rails wherever required, assembling of Turnout on formation providing and fixing curve/ LWR board, etc. as directed and as per IRPWM with latest correction slip in connection with Miraj - Latur Gauge Conversion Project. Central Railway, Mumbai Completed

# Project Name Location Description Position Status
24 Track and all related works for Sambalpur-Titlagarh Project Odisha Construction of Track Linking (excluding supply of rails and sleepers, thick web switches), supply of ballast, S&T, OHE/RE and General Electric works in between Badmal-Titlagarh Section (20 Kms) in connection with Sambalpur-Titlagarh Doubling Project. Rail Vikas Nigam Limited Completed
40 Private Railway Siding work in Darlipali- Dulanga MGR section Package-2 Odisha Construction of private railway siding with all Contractor’s materials (except Rails for plain track issued free of cost) for coal transportation system for Darlipali STPP of NTPC Limited in Sundergarh Distt in Odisha state–For Inside Plant to Ch. 4062 – Pkg. 2 in Darlipali- Dulanga MGR section. Ircon International Ltd. Completed

# Project Name Location Description Position Status
16 P-Way Maintenance, S&T Maintenance Punjab AMC Services for P-Way Maintenance and S&T maintenance Nabha Power Limited Completed
70 Track work and Supply of P-Way material at Ahmedgarh, near Ludhiana. Punjab Supply of P. Way material and Linking of Railway Track siding and its connectivity from Ahmedgarh station to inside MMLH Ahmedgarh, near Ludhiana. Container Corporation of India Ltd Completed
79 CTR at Guru Gobindsingh Power Plant at Ropar Punjab CTR at Guru Gobindsingh Super Thermal Power Plant at Ropar, Punjab. Punjab State Power Corporation Completed

# Project Name Location Description Position Status
41 Railway Siding and Building Works at Jobner Rajasthan Construction of Railway Siding (P-Way) and Building works at Jobner Bharat Petroleum Corporation Limited Completed
83 Churu Gauge Conversion Project at Jaipur-Sikar-Loharu & Sikar Rajasthan Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines/Sidings including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.Way materials and other ancillary works in Zone-I (Km. 0.0 to Km. 48.70) including Sikar, Laxmangarh Sikar & Fatehpur Shekhawati yards in Sikar - Churu section in connection with Jaipur-Sikar-Loharu & Sikar - Churu Gauge conversion project NWR Railway Completed

# Project Name Location Description Position Status
14 Construction of Major Bridge, Minor Bridges,Buildings and other allied works at Khurja Uttar Pradesh Supplying, Laying and Linking of P-Way works including Earthwork in Formation, Construction of Major Bridge, Minor Bridges, Buildings and other allied works From Ch +5.000 km to +14.000 Km at Khurja STPP near Danwar railway station in Dist. Bulandshahar (U.P.) (Package-II) THDC India Limited Completed
73 Supply of PSC Sleepers at Anpara, Sonebhadra Uttar Pradesh Supply and Stacking of PSC Sleepers for Ampara ”D” Thermal power project (2x500MW) at Anpara Dist. Sonebhadra UP UP Rajya Vidyut Utpadan Nigam Ltd. / RITES, Lucknow Completed

# Project Name Location Description Position Status
35 Railway Track for Plant Internal Yard (Pkg.095B) for SAIL, Bhilai Chhattisgarh Railway Track for Plant Internal Yard (Pkg.095B) at BSP Bhilai SAIL Completed
38 Railway Siding Work at Raigarh Chhattisgarh BG. Railway siding work comprising a new mid-section crossing station located between SECR’s Robartson and Bhupdeopur station together with siding facilities for the proposed SKS Power Generation Co. Ltd. (SPGCL) 4x300MW coal SKS Power Generation (Chhattisgarh) Ltd. Completed
50 Earthwork and Construction of Minor Bridges at NTPC railway siding in Raigarh Chhattisgarh Execution of earthwork in formation, Construction of Minor Bridges, Blanketing, P-way Linking works including supply of P-Way fitting, track ballast, PSC sleeper and points and crossing in connection of NTPC railway Siding in Raigarh district, Chattisgarh state (Package II C) RITES Limited Completed
50 Strengthening and Construction of Rail System at Korba (West) Chhattisgarh Strengthening and Construction of Rail system for heavy consignment like stator movement from Gevra road to CSPGCL 1x500 MW TPP, Korba (West) RITES Limited Completed
# Project Name Location Description Position Status
15 Broad Guage Linking of Railway Track in Bangladesh Bangladesh Linking of Broad Gauge LWR/SWR Railway Track with 60Kg Rail Section including Supply of Fittings and fastening system as per approved design/drawing/specification for construction of Khulna/Mongla Port Rail Line Project. Ircon International Ltd Completed
# Project Name Location Description Position Status
78 Broad Gauge Railway Siding work at HPCL-Kadapa. Andhra Pradesh Construction of Broad Gauge Railway Siding Including Lead Line & R&D Yard and Unloading Line at KADAPA for HPCL Hindustan Petrolium Corporation Ltd., (HPCL) – Kadapa Completed
# Project Name Location Description Position Status
78 Broad Gauge Railway Siding work at HPCL-Kadapa. Andhra Pradesh Construction of Broad Gauge Railway Siding Including Lead Line & R&D Yard and Unloading Line at KADAPA for HPCL Hindustan Petrolium Corporation Ltd., (HPCL) – Kadapa Completed
# Project Name Location Description Position Status
35 Railway Track for Plant Internal Yard (Pkg.095B) for SAIL, Bhilai Chhattisgarh Railway Track for Plant Internal Yard (Pkg.095B) at BSP Bhilai SAIL Completed
38 Railway Siding Work at Raigarh Chhattisgarh BG. Railway siding work comprising a new mid-section crossing station located between SECR’s Robartson and Bhupdeopur station together with siding facilities for the proposed SKS Power Generation Co. Ltd. (SPGCL) 4x300MW coal SKS Power Generation (Chhattisgarh) Ltd. Completed
50 Earthwork and Construction of Minor Bridges at NTPC railway siding in Raigarh Chhattisgarh Execution of earthwork in formation, Construction of Minor Bridges, Blanketing, P-way Linking works including supply of P-Way fitting, track ballast, PSC sleeper and points and crossing in connection of NTPC railway Siding in Raigarh district, Chattisgarh state (Package II C) RITES Limited Completed
50 Strengthening and Construction of Rail System at Korba (West) Chhattisgarh Strengthening and Construction of Rail system for heavy consignment like stator movement from Gevra road to CSPGCL 1x500 MW TPP, Korba (West) RITES Limited Completed
# Project Name Location Description Position Status
10 Weld Renewal by FBW at Ahmedabad Gujarat Conversion of SWR/Free rails into LWR by using flash butt welds with mobile flash butt Plant Western Railway Completed
43 Doubling of Track between Palanpur and Bhildi in Ahmedabad Division Gujarat Doubling of track between Palanpur and Bhildi (43.68 Kms.) – Construction of Roadbed, bridges, supply of ballast, Installation of track (excluding supply of rails & PSC line sleepers), Electrical (General Electrification), Signaling and Telecommunication works. Package 5 in Ahmedabad Division of Western Railway RVNL Completed
44 Roadbed, Bridges, Supply of Ballast, Installation of Track Package-2 in Bhavnagar Division Gujarat Construction of Roadbed, bridges, supply of ballast, Installation of track (excluding supply of rails & PSC sleepers), Electrical (Railway Electrification and General Electrification), outdoor signalling and telecommunication works for Gauge conversion of track between Lunidhar (excluding) and Jetalsar (including) from Km. 49.50 to Km. 104.50. Package-2 in Bhavnagar Division of Western Railway RVNL Completed
54 Gauge Conversion BOT Project between Mehasana -Viramgam Section. Gujarat Gauge Conversion between Ch 000m to 24000m of Mehasana -Viramgam Section including earth works, bridge works & gate approaches excluding track fittings of Western Railway on BOT basis track linking contract. Western Railway / Viramgam Mehesana BOT Project. Completed
64 Surendranagar Pipavav BG Rail Link Project. Gujarat Linking of BG Main line, Points and Crossings at various yards, spreading of ballast, P.way materials and other incidental works between stations Surendranagar (Incl) KM 0.00 and Chuda (Excl) KM 38.80 in connection with Surendranagar Pipavav BG Rail Link Project. Western Railway, Mumbai Completed
# Project Name Location Description Position Status
11 Land development work Jammu Land development work at Jammu & Kashmir Bharat Petroleum Corporation Limited Completed
# Project Name Location Description Position Status
13 Permanent way and associated civil works Jharkhand Permanent way and associated civil works for Railway siding at BPCL Radhagaon POL depot, Bokaro Bharat Petroleum Corporation Limited Completed
48 Steel Composte Girder ROB between Lohardaga and Tori Jharkhand Construction of Steel composite Girder Road Over Bridge No. 75C of Span 1 X 24 M at Chandwa Town (Ch 40.305 km) over Chandwa Mckluesganj Road (SH-142) between Lohardaga (0.00 km) and Tori and other allied work of S.E.Railway South Eastern Railway Completed
# Project Name Location Description Position Status
80 Earthwork in Cutting & Embankment (Filling) at NTPC In-plant yard - Kudgi (Package I) Karnataka Earthwork in Cutting & Embankment (Filling), Bridge approaches, side drains, etc., from Chainage 3/800 – 5/400 (Filling beyond Chainage 5/400 and upto Chainage 7/800 also) Package – I at NTPC In-plant yard for construction of new Railway siding for NTPC Limited between Gadag – Hotgi section of South Western Railway at Kudgi. Konkan Railway Corporation Limited Completed
48 Track work at NTPC Kudgi Karnataka LINKING OF TRACK AND COMMISSIONING OF RAILWAY SIDING INCLUDING SUPPLYING OF PSC SLEEPERS, TRACK FITTINGS, TURNOUTS, BALLAST BETWEEN CH 2/850 TO CH 10/200 FOR KUDGI STPP,NTPC LTD. AT KUDGI, DIST BIJAPUR, KARNATAKA Konkan Railway Corporation Ltd Completed
# Project Name Location Description Position Status
28 Composite Girder and Major Bridge at Gadarwara Madhya Pradesh Construction of composite Girder Major Bridge (Well foundation) for Shakkar river at Ch. 6770 and construction of other 10 pre- tensioned/ post tensioned single/ double span bridges (6.1 M, 9.15 M, 12.2 M) between ch. 0/178 to ch. 5/980 for Gadarwara Railway siding. RITES Limited Completed
29 Earthwork and Track Linking at Khargone (Package II) Madhya Pradesh Earthwork in Railway formation including filling, cutting, blanketing and construction of bridges, P way track linking works including supply of Railway track ballast and P way materials, fittings and fixtures (including supply of Rails) etc. in connection with construction of Railway infrastructure to serve Khargone STPP (2X660) MW (Package II) RITES Limited Completed
30 Earthwork and Track Linking at Khargone (Package V) Madhya Pradesh Earthwork in Railway formation including filling, cutting, blanketing and construction of bridges, P way track linking works in connection with construction of Railway infrastructure to serve Khargone STPP (2X660) MW (Package V) RITES Limited Completed
39 Earthwork, Track linking & ROB at NTPC Khargone (In-Plant Yard) Madhya Pradesh Construction of Earthwork, ROB along with approaches, supply of ballast, p-way materials, p-way linking and allied works for private railway siding works at in plant yard of NTPC Khargone STPP RITES Limited Completed
81 Railway siding work at Sanjay Gandhi Thermal Power Station, Birsinghpur - Umaria Madhya Pradesh Laying & Linking of P. way including supply of P. way Materials, turnouts, supply and spreading of stone ballast, supply of PSC sleeper etc. complete in connection with proposed Railway siding at SGTPS at Birsinghpur Dist. Umaria for M/s. MPPGCL RITES, Nagpur / Madhya Pradesh Power Generation Co. Ltd. (MPPGCL) Completed
# Project Name Location Description Position Status
9 Stone Crushed Ballast Supply at Bhusawal Division Maharashtra Supply and Stacking of 65 mm Gauge Machine Crushed Stone Ballast and loading into Hoppers/Boby and wagons by mechanical means. Central Railway Completed
12 Proposed elimination of Level Crossing Maharashtra Proposed elimination of Level crossing by providing subway by box pushing method in lieu of LC No. LC 158 at Kms 452/22-24, LC No 165 at Km 464/10 -12, LC No. 166 at Km 466/02-04, LC No. 170 at Km 472/22-24, LC No. 174A at Km 496/10-12, LC No. 174 at Km 492/22-24, LC No. 172 at Km481/22-24 and LC No. 164 at Km 462/00-02. Central Railway Completed
17 Stone Crushed Ballast Supply at Ahmednagar – Beed – Parli (IV) Maharashtra Supply of machine crushed stone ballast of size 65mm as per RDSO specification for track ballast IRS GE-1 June 2004 & stacking same along cess/ within available space on Railway Land or on the embankment as directed by Engineer-in-charge between km 210.000 to Parli (V) in Beed-Parli section in connection with Ahmednagar-Beed-Parli Vaijnath New Broad Gauge Line Project Central Railway Completed
18 Stone Crushed Ballast Supply at Ahmednagar – Beed – Parli (III) Maharashtra Supply of Machine Crushed Stone Ballast of size 65 mm as per RDSO specification for Track ballast IRS GE-1 June 2004 & stacking same along cess / within available space on Railway Land or on the embankment as directed by Engineer - in - charge between Km 142.00 to 160.00 in Amalner-Raimoha Section in connection with Ahmednagar - Beed - Parli Vaijnath New Broad Gauge Line Project Central Railway Completed
19 Stone Crushed Ballast Supply at Ahmednagar – Beed – Parli (II) Supply of Machine Crushed Stone Ballast of size 65 mm as per RDSO specification for Track ballast IRS GE-1 June 2004 & stacking same along cess / within available space on Railway Land or on the embankment as directed by Engineer - in - charge between Km 120.00 to 142.00 in Amalner-Raimoha Section in connection with Ahmednagar - Beed - Parli Vaijnath New Broad Gauge Line Project Central Railway Completed
20 Stone Crushed Ballast Supply at Ahmednagar – Beed – Parli (I) Supply of Machine Crushed Stone Ballast of size 65 mm as per RDSO specification for Track ballast IRS GE-1 June 2004 & stacking same along cess / within available space on Railway Land or on the embankment as directed by Engineer – in – charge between Km 50.250 to 100.252 in Kada – Amalner section in connection with Ahmednagar – Beed – Parli Vaijnath New Broad Gauge Line Project Central Railway Completed
23 Track Work at Pune-Miraj Track work in connection with Pune Miraj Doubling Project Central Railway Completed
26 Weld Renewal by FBW at Kurduwadi Through weld renewal by mobile flash butt welding plant between Km.343.40-345.30=1.90 Km, 345.60-349.20=3.60 Km, 349.50-350.80=1.30 Km, 351.10-383.20=32.10 Km, 397.10-400.20=3.10 km, 400.50-420.80=20.30 Km and 383.50-396.70=13.20 Km, total 75.50 Km. Central Railway Completed
27 Earthwork and Extension of Bridges at Pune-Miraj (Section I) Earthwork in embankment and cutting including extension of Minor Bridges and RUBs in connection with Pune-Miraj doubling from km 0.00 (Pune) to km 65 (excluding Daunduj) Central Railway Completed
33 Railway Siding Earthwork at Tilati station in Solapur Division Execution of Railway Siding works consisting of Earthwork in embankment and cutting, Supply and spreading of Ballast, Supply of P-Way materials, Laying and linking of Railway Track, construction of bridges, works for entire siding in both In-plant yard and Station yard for CCCL- Solapur proposed siding take off from New Tilati station in Solapur Division of Central Railway Chettinad Cement Completed
34 Road Over Bridge at Chandrapur Construction of Road Over Bridge (ROB) for BG Railway Siding at CSTPS Chandrapur Rail Infrastructure Facilities at Chandrapur Distt. (MS) for the proposed 2x500 MW expansion Project. Maharashtra State Power Generation Co. Limited Completed
36 Private Railway Siding at NTPC Limited near Hotgi Railway Station Construction of Private Railway Siding with all Contractor’s materials (except Rails for plain track issued free of cost) for coal transportation system for SSTPP of NTPC Limited near Hotgi Railway Station – Civil works from Ch. 2.400 to Ch. 6.000 & P.Way works in entire siding system – Pkg. 2 IRCON INTERNATIONAL LIMITED Completed
37 Balance work of Site Leveling & Infrastructure Works near Hotgi Railway Station Balance work of Site Leveling & Infrastructure Works Package for Solapur Super Thermal Power Project (2x 660 MW) NTPC Completed
42 Private Railway Siding at Inplant Yard NTPC- Mouda (Stage-II) Construction of Earthwork, RCC Bridges (Cast-insitu and Cut & Cover), FOB, Loco Shed, Supply of Ballast, P-way Materials and P-way linking work for private railway siding (Stage-II) works at Inplant yard of NTPC- Mouda RITES Ltd. Completed
47 Itarsi-Nagpur third line project Construction of Minor Bridges (RCC Box), Earthwork in formation side drains and Toe/ retaining wall between Km. 912 to Km 930.4 between Chichonda section (including) and Teegaon Station (Including) for Teegaon-Chichonda 3rd Line of Itarsi-Nagpur Section. Central Railway Completed
49 Khamgaon to Deulgaon Road Project Upgradation of Khamgaon to Deulgaon Sakarsha Section (Length of 35.786 Km) of NH-548C from Existing Ch. 565+653 to Ch. 529+867 (Design Ch. 0+000 to Ch. 35+786) in the State of Maharashtra to 2 Lane with Paved Shoulder (Package-I). (Approximately 35.786 km) NHAI Completed
55 Track and Station Building Works at Ratnagiri Main Line Construction of 8 nos. of Crossing stations and 7 nos. of additional loop lines at Existing stations of Konkan Railway. Konkan Railway Corporation Limited Completed
56 Mangrulpir to Mahan Road Project Rehabilitation and Upgradation of 2 lane road with paved shoulders of Mangrulpir to Mahan (NH 161 A from 97/074 to 64/574 ) [Design km. 75/000 to km. 107/500] (Total Length = 32.5 Km) in the state of Maharashtra on EPC Basis mode. NHAI Completed
65 CTR (P) of track by PQRS method at IGP Bhusawal. CTR (P) of track by PQRS method bet. Kms.287 to 295&297.2 to326 = 36.80 Tkms(without deep screening)25.00 Tkms by PQRS and 11.80 by manual method on Dn Rd of IGP- BSL sec. CTR (S) of CSN-DHI Sec. Betn Kms. 359.5to 369.5 = 10.00 of IGP-BSL Section Central Railway, Mumbai Completed
66 Puntamba – Shirdi New BG Rail line project. Laying & Linking of track between Ch. 000 to Ch. 18000(Entire Length) in connection with Puntamba – Shirdi New BG Rail line project. Central Railway, Mumbai. Completed
67 Talvadiya-Khirkiya Mainline Diversion Project. (Ch. 000 m to Ch. 30000 m) Linking of Double Line Track, including supply of minor track fitting and other misc. works between Ch. 000m to Ch. 30000 m of Talvadiya-Khirkiya Mainline Diversion Project. Central Railway, Mumbai Completed
68 Laying & Linking of Track at Majri Khadan Laying & Linking of track, assembling& insertion of Turnouts, dismantling of track/ turnouts, welding of Rail joints, running out of ballast etc & Supply of P. way Fittings at Majri, Majri Khadan, Wani & Pimpalkhuti in connection with running of passenger Train services. Central Railway, Mumbai. Completed
69 Narkher - Amravati New BG Line Project Laying & Linking of P. way and supply of P. way fittings etc. between ChandurBazar and Badnera stations in Ch. 94000m to 136150m Narkher - Amravati New BG Line. Central Railway, Mumbai Completed
69 Narkher - Amravati New BG Line Project Laying & Linking of P. way and supply of P. way fittings etc. between ChandurBazar and Badnera stations in Ch. 94000m to 136150m Narkher - Amravati New BG Line. Central Railway, Mumbai Completed
71 Conversion MG to BG Project between Purna – Akola Stations Conversion of Purna-Akola section from MG to BG miscellaneous works including dismantling of existing MG track between Purna – Akola Stations Reach – I, II, V, IX, XII, XIII, XIV, XV, XIX, XX South Central Railway, Secunderabad Completed
74 Khaparkheda TPS (Expansion Project) Khaparkheda TPS (Expansion Project) – Renovation of BG Railway Siding, including Minor earthwork, Misc civil works and all incidentals works etc in Exchange Yard and Implant Yard at Khaparkheda TPS Dist. Nagpur. Maharashtra State Power Generation Co. Ltd. (MSPGCL) Mumbai Completed
75 Gauge Conversion Project between Osmanabad and Kurudwadi Section Laying & Linking of B.G. Track in Osmanabad – Kurudwadi section in connection with Miraj - Latur Gauge Conversion Project Central Railway, Mumbai Completed
76 Complete Rail system Renovation at Nasik TPS, Eklahare. Nasik TPS – Work of Complete Rail system Renovation of Nasik Thermal Power Station including earthwork, all civil works and incidental works etc at Nasik TPS. Eklahare, Nasik. Maharashtra State Power Generation Co. Ltd. (MSPGCL) Mumbai Completed
77 BTPS Expansion Project at Deepnagar BTPS Expansion Project 2x500 MW unit – Construction of B.G Railway siding for Bhusawal TPS Expansion Project 2x500 MW Deepnagar, BHUSAWAL. Maharashtra State Power Generation Co. Ltd. (MSPGCL) Mumbai Completed
82 Gauge Conversion Project between Latur and Osmanabad Section Laying & Linking of B.G. Track in Latur - Osmanabad section & making the same as LWR track including insertion of Glued Joints, SEJ, Providing Check/ guard Rails wherever required, assembling of Turnout on formation providing and fixing curve/ LWR board, etc. as directed and as per IRPWM with latest correction slip in connection with Miraj - Latur Gauge Conversion Project. Central Railway, Mumbai Completed

# Project Name Location Description Position Status
24 Track and all related works for Sambalpur-Titlagarh Project Odisha Construction of Track Linking (excluding supply of rails and sleepers, thick web switches), supply of ballast, S&T, OHE/RE and General Electric works in between Badmal-Titlagarh Section (20 Kms) in connection with Sambalpur-Titlagarh Doubling Project. Rail Vikas Nigam Limited Completed
40 Private Railway Siding work in Darlipali- Dulanga MGR section Package-2 Odisha Construction of private railway siding with all Contractor’s materials (except Rails for plain track issued free of cost) for coal transportation system for Darlipali STPP of NTPC Limited in Sundergarh Distt in Odisha state–For Inside Plant to Ch. 4062 – Pkg. 2 in Darlipali- Dulanga MGR section. Ircon International Ltd. Completed

# Project Name Location Description Position Status
16 P-Way Maintenance, S&T Maintenance Punjab AMC Services for P-Way Maintenance and S&T maintenance Nabha Power Limited Completed
70 Track work and Supply of P-Way material at Ahmedgarh, near Ludhiana. Punjab Supply of P. Way material and Linking of Railway Track siding and its connectivity from Ahmedgarh station to inside MMLH Ahmedgarh, near Ludhiana. Container Corporation of India Ltd Completed
79 CTR at Guru Gobindsingh Power Plant at Ropar Punjab CTR at Guru Gobindsingh Super Thermal Power Plant at Ropar, Punjab. Punjab State Power Corporation Completed

# Project Name Location Description Position Status
41 Railway Siding and Building Works at Jobner Rajasthan Construction of Railway Siding (P-Way) and Building works at Jobner Bharat Petroleum Corporation Limited Completed
83 Churu Gauge Conversion Project at Jaipur-Sikar-Loharu & Sikar Rajasthan Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines/Sidings including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.Way materials and other ancillary works in Zone-I (Km. 0.0 to Km. 48.70) including Sikar, Laxmangarh Sikar & Fatehpur Shekhawati yards in Sikar - Churu section in connection with Jaipur-Sikar-Loharu & Sikar - Churu Gauge conversion project NWR Railway Completed

# Project Name Location Description Position Status
14 Construction of Major Bridge, Minor Bridges,Buildings and other allied works at Khurja Uttar Pradesh Supplying, Laying and Linking of P-Way works including Earthwork in Formation, Construction of Major Bridge, Minor Bridges, Buildings and other allied works From Ch +5.000 km to +14.000 Km at Khurja STPP near Danwar railway station in Dist. Bulandshahar (U.P.) (Package-II) THDC India Limited Completed
73 Supply of PSC Sleepers at Anpara, Sonebhadra Uttar Pradesh Supply and Stacking of PSC Sleepers for Ampara ”D” Thermal power project (2x500MW) at Anpara Dist. Sonebhadra UP UP Rajya Vidyut Utpadan Nigam Ltd. / RITES, Lucknow Completed