Loading...

Projects by map

# Project Name Location Description Position Status
1 Construction of Major Bridges, Underpasses for Wildlife and Road Over Bridges (ROBs) Chhattisgarh Construction of Major Bridges, Underpasses for Wildlife and Road Over Bridges (ROBs) between Urga (0 Km) to Dharamjaigarh (62 Km) Single line in connection with the construction of New BG Electrified Single Railway Line for Chhattisgarh East Rail Corridor Phase-II. IRCON Ongoing

# Project Name Location Description Position Status
1 Bhuj Naliya Gauge Conversion Project. Gujarat Laying and linking of tracks and various P.way works, supply of ballast, Earthworks in bank and cutting for formation including supplying and spreading of blanketing material, minor bridges with PSC Slabs, RCC pipes, RCC box bridges, RCC Boxes in connection with closed LCs (other than LHS), Protection works such as stone pitching, construction of Toe walls, Retaining walls, Side drains, etc Western Railway Ongoing
2 Design, Supply, Installation, Testing and Commissioning of Ballastless Track for GMRCL Gujarat Design, Supply, Installation, Testing and Commissioning of Ballastless Track from Sarthana to Dream City in Elevated and Underground Sections Including Connecting Lines to Depot along with Ballasted / Ballastless / Embedded Standard Gauge Track For Corridor-I. Gujarat Metro Rail Corporation Limited Ongoing

# Project Name Location Description Position Status
1 Construction of Elevated BG Railway line. Haryana Construction of Elevated BG Railway line from Km 80/1 to Km 85/7 along with elimination of 05 nos. Level crossings in Kurukshetra City. HRIDC Ongoing

# Project Name Location Description Position Status
1 Construction of 05 Nos. of Major Bridges & 05 Nos. of ROBs Jharkhand Construction of 05 Nos. of Major Bridges & 05 Nos. of ROBs from 28.682 Km to 44.278 Km between Simariya and Shivpur. IRCON Ongoing
2 Construction of 6 Nos. RUB/LHS in lieu of existing level crossing Jharkhand Construction of 6 Nos. RUB/LHS in lieu of existing level crossing No. 4/C/E at km 277/22-24, 5/C/T at km 278/18-20, 6/C/T at km 281/4-6, 7/C/E at km 283/16-18, 10A/C/T at km 306/11-13 & 11/C/T at km 309/19-21 in between PKA-MPO section of Dhanbad division East Central Railway Ongoing
3 Construction of Superstructure of 09 nos Major Bridges. Jharkhand Construction of Superstructure of 09 nos Major Bridges in connection with 3rd line of Tori Shivpur New B.G. Rail line Project. East Central Railway Ongoing

# Project Name Location Description Position Status
1 Construction of bridge work (Major/Minor - foundation, sub structure and super structure) Madhya Pradesh Earthwork & Blanketing in embankment /cutting in formation of new BG line including yards, bridge approaches etc., Construction of bridge work (Major/Minor - foundation, sub structure and super structure) as per Railway's approved Design and Drawing, carting of steel girder component, construction of Retaining/Boundary/Toe wall, supply & spreading of machine crushed stone ballast, Laying and linking of BG track for Main line, loop lines and Points&Crossing etc in section/ yards, Transportation of P.Way materials, Welding of Rails, and other incidental miscellaneous works etc Western Railway Ongoing
2 Gauge Conversion of Track between joining Point at Amlakhurd station and Tukaithad station on EPC mode. Madhya Pradesh Engineering works of construction for Gauge Conversion of Track between joining Point at Amlakhurd station and Tukaithad station including Electrical General Services on EPC mode. South Central Railway Ongoing
3 Four-Laning of NH-45 of Jabalpur Ring Road, Pkg-3. Madhya Pradesh Construction of Four-Laning of NH-45 to Kushner from km 39.175 to km 75.480 (Jabalpur Ring Road, Pkg-3) under Bharatmala Pariyojana. NHAI Ongoing
4 Ballasted/Ballastless Tracks for complete Indore Metro Rail Project for MPMRCL Madhya Pradesh Design, Supply, Installation, Testing and Commissioning of Ballastless Track of Standard Gauge, Yellow Line from Gandhinagar- Bawarsala-Bengali Square-Indore Railway Station and Underground from Indore Railway Station to Airport Station of Yellow Line Corridor. Madhya Pradesh Metro Rail Co Limited Ongoing
5 Conversion of track from MG to BG Madhya Pradesh Conversion of track from MG to BG between Khandwa and Amlakhurd stations- Proposed transportation of Rails & Sleepers, laying and linking of BG track, assembling of Points & Crossings and connected works. South Central Railway Ongoing
6 10 Nos Major Bridges in between Gwalior to Sabalgarh section Madhya Pradesh Construction of 10 Nos Major Bridges in between Gwalior to Sabalgarh section in connection with the work of Gauge conversion from Gwalior to Sheopurkalan. North Central Railway Ongoing
7 Earthwork in Embankment and Cutting including blanketing, Minor Bridges at Gwalior Madhya Pradesh Earthwork in Embankment and Cutting including blanketing, Construction of Minor Bridges, LHS/Subways, Side Drains, retaining/Toe Walls and Other Ancillary works/services works between Sumaoli (Exclu.)- Sabalgarh (Inclu.) and dismantling of existing NG track between Banmoregoan to Sabalgarh, Gwalior- Sheopuprkalan North Central Railway Ongoing

# Project Name Location Description Position Status
5 Construction of new BG line in Solapur-Osmanabad section. Maharashtra Construction of new BG line from chainage 52500 to 83200 in Solapur-Osmanabad section of Solapur Division. Central Railway Ongoing
8 Track (P.Way) works of Proposed New 3rd line and Yards between Chalisgaon to Manmad. Maharashtra Track (P.Way) works of Proposed New 3rd line and Yards between Chalisgaon (Including) to Manmad (Including) section 67.28Kms in connection with MMR- JL 3rd line. Central Railway Ongoing
22 Minor Bridges,Major Bridges, ROBs & RUBs at Yavatmal Maharashtra Construction of Roadbed, Minor Bridges,Major Bridges, ROBs & RUBs including road approaches , Station Buildings, Staff Quarters, Other service buildings, HL Platforms, COPs, FOBs, General Electrification & other Works related to Construction of Yavatmal – Nanded New BG Line from km 78.00 (Excluding Yavatmal Station) to km 110 (Including Tapona Station) of Central Railway. Rail Vikas Nigam Limited Ongoing
23 ROB and RUB works at Savda Railway Station Maharashtra Construction of ROB and RUB, Limited Height Subway in lieu of existing railway crossing No. 162 at Kms 459/9-11 near Savda Railway Station Central Railway Ongoing
24 Bridges and Earthwork between Chalisgaon-Jalgaon section Maharashtra Construction of 165 nos. Minor Bridges in Earthwork and Embankment and Cutting between Chalisgaon Jalgaon section. Central Railway Ongoing
25 Railway Siding Works Consists of P-Way Linking, (ROB), (OHE) and (S&T) work at Deepnagar, Bhusawal Maharashtra Construction of Railway Siding Works Consists of P-Way Linking, Road Over Bridge (ROB), Over Head Electrification (OHE) and Signaling & Telecommunication (S&T) for MSPGCL. BHEL Ongoing

# Project Name Location Description Position Status
1 Construction of 2 lane ROB Rajasthan Construction of 2 lane ROB in Lieu of LC No.- 179X at Railway Km. 1094/36 -1095/02 at Gangapur City. EPIL Ongoing

# Project Name Location Description Position Status
1 Maintenance of double line BG track including DFCCIL Yards. Uttar Pradesh Maintenance of double line BG track including DFCCIL Yards, Formation, Major & Minor Structure, Civil Works like Buildings (i.e Stations, IMDs / IMSDs / ALH / RH / GSMR / Gate lodge & other allied buildings) of New Bhaupur to New Khurja Section (i/c its connecting lines with IR) of Eastern Dedicated Freight Corridor. DFCCIL Ongoing
2 Excavation of overburden of first dig (solid) Uttar Pradesh Excavation of overburden of first dig (solid) overburden for composite work consisting of blast hole drilling, excavation, loading, transportation of broken rocks/ soil/ earth, unloading/dumping, spreading, dozing, water sprinkling and grading at Khadia. Northern Coalfields Limited Ongoing
3 Construction of approaches & viaduct of Br No 111, Roadbed, Major & Minor bridges Uttar Pradesh Construction of approaches & viaduct of Br No 111, Roadbed, Major & Minor bridges between Jhusi (excluding) to Prayagraj Rambag (excluding). RVNL Ongoing